INTRODUCTION
Quality
 control in terms of garment manufacturing, pre-sales and posts sales 
service, delivery, pricing, etc are essential for any garment 
manufacturer, trader or exporter. Certain quality related problems, 
should never be over looked. The consumers want to get high quality 
products in low price. The products should reach the consumers with 
right quality depends on the cost. Quality management is the aspect of 
the overall management function that determines and implements the 
quality policy. Quality assurance covers all the process within a 
company that contributes to the production of quality products. The 
inspection is carried out by representatives of the current production 
and the result record on control chart. The aim of garment inspection is
 to visually inspect articles at random from a delivery in order to 
verify their general   conformity and appearance with 
instruction/description and/or sample received.
 METHODOLOGY
At
 first all the data are collected from different reports and documents 
of different garment factories. When these data become not sufficient, 
some other data are collected by close observation and over telephone. 
This is a descriptive and analytical study. The sample size is 07 
(seven). The collected data are processed with MS Excel and all biased 
& incomplete data deleted from the data bank.
 THEORY
Certain
 quality related problems, often seen in garment manufacturing like 
sewing, colour, sizing, or garment defects should never be over looked.
Sewing defects
Open
 seams, wrong stitching techniques, nonmatching threads, missing 
stitches, improper creasing of the garment, improper thread tension etc.
 are some of the sewing defects.
 Colour defects
Variation of colour between the sample and the final garment, wrong colour combinations and mismatching dyes.
 Sizing defects
Wrong
 gradation of sizes, difference in measurement of various parts of a 
garment like sleeves of XL size for body of L size garment can 
deteriorate the garments beyond repair.
Finished garment defects
Broken
 or defective buttons, snaps, stitches, different shades within the same
 garment, dropped stitches, exposed notches, fabric defects, holes, 
faulty zippers, loose or hanging sewing threads, misaligned buttons and 
holes, missing buttons, needle cuts, pulled or loose yarn, stains, 
unfinished buttonhole, short zippers, inappropriate trimmings etc. all 
can lead to the end of a brand name even before its establishment.
Methods of quality control:
Basically two methods are used for garments quality control –
a) Testing
b) Inspection.
Quality Control System is followed by all concerned in the company from piece goods inspection to the final statistical audit.
(1)
 Piece goods quality control: On receipt of fabrics in the ware house, 
at least 10% are inspection as per “4 Points” system/10 Points 
system/2.5 Point system/6.0 Point system. The most commonly used
4 Points system as per below –
SIZE OF DEFECT PENALTY
3 Inches or less 1 Point
Over 3, under 6 Inches 2 Point
Over 6, under 9 Inches 3 Point
Over 9 Inches 4 Point
A maximum of 4 points are changed in one linear yard.
(2) Cutting quality control: In cutting section quality is insure in two stages.
a) Spreading quality control: Following the point are checked during spreading
I. Table marking.
II. Ends
III. Tension
IV. Leaning
V. Narrow Goods
VI. Counts
VI. Ply height
VII. Remnants
VIII. Fabric flaws
IX. Market placing
b) After cutting quality control: After each cutting blocks and bundles are checks on the following points.
I. Mis cut
II. Ragged cutting
III. Pattern checks
IV. Matching Plies
V. Notches
(3) In process quality control (Sewing):
During
 the swing “In process quality control” is done by the line QC’s through
 7 pcs inspection system. For critical operations 100% process 
inspection are carried out. The following parameters are also checked in
 sewing process –
a) Machine check.
b) Tension.
c) SPI checks
d) Needle check.
e) Cleanness.
d) Table inspection.
f) Inspection before wash.
(4) Washing section
a) Garments handling
b) Wash standard.
c) After wash thoroughly inspection.
(5) Quality control of finishing sections: Following inspection/audit is done to attain AQL (1.5/2.5/4.0
etc).
a)
 Process inspection: Garments are checked process wise in the finishing 
section to identify defects and pass only the passed garments.
b) Two hourly audit: Every after two-hours audit is done on finishing lot to attain AQL the required
AQL.
c)
 Days final audit: At the end of the day accumulated lot of finished 
garments are statistically audited to attain required AQL.
d) Lot final audit: On completion of packing of one
complete
 lot of garment, QA manager conduct statistical audit based on required 
AQL garments. Garments are offered for final inspection by buyer 
/clients for shipment only when these are through in this audit. The 
following parameters are also checked in sewing process–
a) After wash garments must be keep in the box table covering.
b) Thread sucking.
c) Iron inspection.
d) Measurements inspection.
e) Poly inspection of top of garments.
f) Inspection before cartoning.
(6) Testing (Lab test):
a) Shrinkage test
b) Colour fastness. test
c) Azo-free test.
QMS (Quality Management System)
“A
 set of co-ordinated activities to direct and control an organization in
 order to  continually improve the effectiveness and efficiency of its 
performance.” Each Quality management systems (TQM, ISO etc) and its 
elements (Statistical process control, (SPC), Kaizen, Advance product 
quality planning and control (APQP), have a distinctive applicability. 
It is necessary that the approach selected suits current and future 
needs of the organization. SPC works towards bringing process under the 
influence of common causes alone by identifying & eliminating 
assignable causes. APQP focuses mainly on new product 
development/project execution. ISO 9000 currently includes three quality
 standards (ISO 9000:2005, ISO 9001:2000, and ISO 9004:2000). ISO 
9001:2000 presents ISO’s new quality management system requirements, 
while ISO 9000:2005 and ISO 9004:2000 Present ISO’s new quality 
management system guidelines. All of these are process standards & 
not product standards and are developed by quality experts from around 
the world for use by companies that either want to implement their own 
in-house quality systems or to ensure that suppliers have appropriate 
quality systems in place.
Labour 
intensive industry like apparel can achieve full benefit of QMS only if 
every individual (Operators and Managers alike) contribute in its 
implementation.
 TQM (Total Quality Management)
TQM
 is a philosophy or approach to management that can be characterized by 
its principles, practices, and techniques. Its three principles are 
customer focus, continuous improvement, and teamwork. Each principle is 
implemented through a set of practices, which are simply activities such
 as collecting customer information or analyzing processes. The 
practices are, in turn, supported by a wide array of techniques.
Successful
 implementation of TQM requires commitment from top management. No QMS 
can bring overnight improvements. It is sustained effort towards 
excellence at each level. Top management should lead by example. This 
can be demonstrated by top management through active participation in 
TQM related activates.
Implementation phases of TQM
TQM
 is a Journey not destination. TQM aim’s at zero defects in each 
functional areas viz. operations, quality, marketing, utility, service, 
etc. As the organization progresses from 5- Standards (5-S) –
Daily
 Work Management (DWM) – Six sigma for each functional area, the 
possibility of defect rate is reduced to almost zero. Following are the 
phases of TQM implementation
1) 5-S-(Sort, set in order, Shine, Standardize, Sustain)
- · Foundation Phase
- · Sustenance Phase
- · Maximize plant up time
- · Instrument & system Calibration
- · Break through Improvement
2) DWM (Daily Work Management)
a) Total Productive maintenance (TPM) –
b) Measurement system Analysis (MSA)
3) Six Sigma-
1)
 5-S 5-S Defined-Total work culture that develops organization’s ability
 to the fullest capacity to enhance creativity and eliminate waste. 
Conceptually 5-S is aimed at developing a work culture where by all 
employees including operators, supervisors and managers participate in 
problem solving process.
Sort (1-S) – 
this is initiated by identifying the abnormalities at the work area. 
Abnormalities are highlighted by unique identification tag also known as
 red tag. This ensures every employee participates
in
 identifying the abnormality in respective work area. It is observed 
that putting red tag improves awareness regarding the abnormality; it 
also triggers a reaction among employees to think for ways for avoiding 
the reoccurrence of abnormality.
Set 
in Order (2-s) – Efforts are then directed towards resolving the tags. 
Objective is to find permanent solution to problem. Day to day quality 
related problems such as label mixing, trims mixing (thread, label 
wrongly attached) can be completely eliminated through 5-S. Ideally 
stores should stack trims segregated buyer wise, order wise etc with 
location marking done for each storage area. This will avoid the 
instances of wrong trims being issued, even if storekeeping personnel 
are not available (eliminating human dependency). Secondly segregation 
of trims on sewing floor/finishing floor size wise, color wise and sizes
 wise in specially designed boxes, trays with location marked for each, 
will eliminate any possibility of trim mixing. Not only this 
(implementing 5-s at stores) reduces the unproductive time (time lost in
 trims searching) at stores level, but also helps in saving time and 
improving quality of immediate customers (Sewing Floor). At 2-S Stage 
(Set in order) it is mandatory to define the inventory level at each 
stage, this not only applies to stores, but also to sewing, finishing, 
washing and packing inventory. Defining and controlling WIP has shown 
marked reduction in stains related rejections, apart from reduction in 
through put time. It is observed that one basic reason of higher WIP is 
higher level of rework and alterations. With respect to WIP management 
aim should be to move towards lean manufacturing with single piece flow.
 Replenishment of WIP/inventory should be Pull driven rather than push 
driven.
Shine (3-s) –3-S ensures 
improved housekeeping by planning, cleaning & Inspection schedules 
that include floor (Brooming, mopping, vacuum), over headlamps, racks 
etc. The cleaning schedules should be designed such that it should 
mention how, when, where, regarding the cleaning activity. It should 
state the person responsible and accountable for implementing the 
schedules.
Standardize (4-s)-This 
refers to standardizing the departmental activities. Here the cleaning 
schedules, master index (indicating location marked for hard and soft 
copies/registers), tool list (stating location and quantity) are 
displayed on notice board. This way human dependency in accessing the 
records and tools/equipment can be eliminated. Apart from this 
operational norms for each department are developed. It includes list of
 incoming material for each department, its desired mode of packing 
/packaging, packing details, desired mode of transportation of incoming 
material, material handling equipment for in house movement etc.
These
 requirements are forwarded to supplier as voice of customer. In 
addition inventory level for each incoming item with storage locations 
is planned.
Generally waste (Shaping 
waste, Empty cones, Threads, Spring cones, polythene, Paper, bamboo etc)
 is segregated at centralized scrap yard. However ideal method is to 
segregate the waste at source of generation. To start with, waste can be
 categorized into organic (Thread, Fabric) and inorganic waste 
(Polybags, plastic cones etc). Color-coding for dustbins should be done 
and training imparted to employees to dispose the waste in right 
dustbin.
Depending on the nature of 
waste generated by the activity, color coded dustbin is provided at 
convenient location. Collection of waste from dustbin and disposal of 
waste to scrap yard should be done by means of similarly colored carts. 
Method for recovering recyclable waste should also be designed. Sustain 
(5-s): regular internal and external audits are scheduled to overcome 
the shortcoming. Time based action plan with responsibility for 
resolving the abnormality is made.
As 
the departmental team matures in the problem solving methodology, it is 
elevated to form Quality circles. Emphasis is to find permanent solution
 to problem at the work level itself, without elevating the problem to 
higher level. Sooner the day today issues are resolved at Work area 
level and managers are free to think regarding improvements. As a rule 
Managers should spend 80% of his time on improvements. Though the
2) Daily work management (DWM)
Consciously
 and consistently carryout all activities which must be performed daily 
(or regularly) to efficiently achieve the aims of each department. In 
principle, these activities aim to maintain the current status, although
 activities to improve the situation are also included.
3) Six Sigma
Six
 Sigma is a business management strategy originally developed by 
Motorola, USA in 1981. As of 2010, it enjoys widespread application in 
many sectors of industry, although its application is not without 
controversy.
Six Sigma seeks to 
improve the quality of process outputs by identifying and removing the 
causes of defects (errors) and minimizing variability in manufacturing 
and business processes. It uses a set of quality management methods, 
including statistical methods, and creates a special infrastructure of 
people within the organization („Black Belts”, „Green Belts”, etc.) who 
are experts in these methods. Each Six Sigma project carried out within 
an organization follows a defined sequence of steps and has quantified 
targets. These targets can be financial (cost reduction or profit 
increase) or whatever is critical to the customer of that process (cycle
 time, safety, delivery, etc.).
The 
term six sigma originated from terminology associated with 
manufacturing, specifically terms associated with statistical modelling 
of manufacturing processes. The maturity of a manufacturing process can 
be described by a sigma rating indicating its yield, or the percentage 
of defect-free products it creates. A six-sigma process is one in which 
99.99966% of the products manufactured are free of defects, compared to a
 onesigma process in which only 31% are free of defects.
DATA ANALYSIS AND FINDINGS Quality control processes of some selected Bangladeshi garments company are as per below –
According
 to theory, there are different parameters to check or inspect for 
maintaining quality control and quality management of garments. Besides 
these, there are also some testing methods are done for keeping the 
right quality of the garments. From collected data the following things 
are found –
This study has 07 samples 
where all the companies follow the 4 point system for inspecting the 
fabric of garments. These also maintain cutting quality, two hourly 
audit, and Lot final audit (at presence of buyers’ representatives). 
Among them 05 (five) companies maintain in process quality control 
(sewing) by 7 Pcs inspection randomly. All these 07 (seven) factories 
done process inspection visually and 05 (five) among them maintain days 
final audit.
Testing such as shrinkage
 test, colour fastness test, azo free test are done by all these 07 
(seven) factories. From the analysis of above data it is seen that every
 garment factory is maintaining AQL 2.5. Quality management system (QMS)
 5’S is used in only 03 (three) factories out of 07 (seven) factories. 
Six Sigma is used none of the 07 (seven) factories.
Daily work management (DWM) is used in all these 07 (seven) factories.
MAJOR FINDINGS
In
 Bangladesh most of the garment factories use different tools for 
quality management but not in organized way. When needs, they use these 
tools haphazardly.
• In Bangladesh most of the garments factories use 4-point system for inspecting fabrics of garments.
• Most of the buyers are importing garments from Bangladesh with AQL (acceptable level) 2.5.
• Most of the garments manufacturers are doing inspection during the manufacturing process of garments.
• Other tests such as shrinkage tests, colour fastness tests, azo free tests are done according to the buyers’ requirement.
RECOMMENDATIONS
• Every garment factory should implement different tools like 5’S, 6 Sigma etc for perfect quality management.
• As inspection is always visual, sometimes machine can be used for inspection of garments.
• The 4-point system has some limitations so that this system should be used with proper care.
• Every test should be done as per international standard as well as buyer’s requirement.
•
 Day final audit is very necessary for any production process so that it
 is needed to implement in every garment manufacturing unit.
• The proper training should be provided for quality related people.
CONCLUSION
In
 Bangladesh every garments manufacturer should give first preference to 
its valued customers. Now-adays buyers are very much quality conscious. 
If it becomes possible to maintain a high Quality system of inspection 
policy, the buyers shall be motivated to place more orders in 
Bangladesh. So, it is possible to set different modern quality 
procedures and quality management techniques in Bangladesh for the 
betterment of its RMG sector.
 
All members involved in the organization are required to participate in improving the products, services, processes and culture of the workplace. Strategy, data, effective communication, and continual improvement are required to bring effective results.
ReplyDeleteQuality Management System Training in India
Thank for sharing information for qms Certification. This is helpful to know the system of quality management ISO Certification.
ReplyDelete
ReplyDeleteISO management systems consultancy agencies assist the companies towards achieving these certifications through calibrated measures that are implemented in a sequenced manner.
I’m curious to find out what blog platform you have been utilizing? I’m having some small security problems with my latest site and I’d like to find something more risk-free. Do you have any suggestions? medical device quality engineering
ReplyDeleteNice blog post dear. Thanks for sharing it. Anyone here looking for ladies garments manufacturer and exporter?. I suggest you to visit India's most trusted company Saivana Exports. This company is dealing with more then 20 popular international brands. Visit their buyer sections.
ReplyDeleteI quite like reading an article that can make people think. Also, thanks for allowing for me to comment! Construction Cost Consultancy services
ReplyDeleteThis is my first time i visit here and I found so many interesting stuff in your blog especially it's discussion, thank you. TN Zunzanyika Associates
ReplyDeleteI quite like reading an article that can make people think. Also, thanks for allowing for me to comment! Rugby World Cup 2019 Live Stream
ReplyDeleteISO13485 certificat more information here https://pro4people.com/iso-13485-medical-devices-certified-quality-management-system/. Team Pro4People are the best!!!
ReplyDeleteI recommend
Its really a good post. Thanks for sharing.
ReplyDeleteISO Certification in UAE